November 26, 2026
Should You Install Solar Panels on an Older Armadale Roof?
By @codyjbft418
Armadale and the surrounding suburbs of Perth's south-east include a https://emilianorntr907.huicopper.com/seven-warning-signs-your-roof-needs-urgent-repairs-now wide mix of housing stock, from 1960s and 1970s brick-and-tile homes to older fibro and asbestos cement sheet roofs, and tin roofs on heritage-era properties. If your roof has a few decades behind it, it is worth asking whether solar is a sound investment or whether the roof should be addressed first. This guide covers the key factors for Armadale homeowners in 2026.

The Short Answer: It Depends on Roof Condition and Material
Solar panels can be installed on many older roofs, but the roof must be structurally sound and have enough remaining life to justify the investment. Solar systems typically last 25 years or more, while some roofing materials will need replacement well before that. Installing panels on a roof that fails in five years means paying to remove and reinstall the entire system, which adds avoidable cost.
Why Armadale's Climate Makes Solar Worthwhile
Perth is one of the sunniest capital cities in Australia, and Armadale benefits from strong solar yields across the year. Long, dry summers deliver high output, and even in winter a well-positioned system produces useful energy. Because the potential return is strong, it makes sense to get the roof right before committing to a system.
Common Older Roof Types in Armadale
Concrete and Terracotta Tiles
Many established Armadale homes have concrete or terracotta tiles. Both can carry solar panels, but installers need to lift tiles to fit mounting brackets. Older, brittle tiles can crack during this process. Expect some tile breakage on roofs that are 30 or more years old, and ask your installer to allow for replacement tiles. Faded or porous tiles may also be nearing the end of their useful life.
Colorbond and Corrugated Metal
Metal roofs are generally among the easiest to mount on, since panels can be clamped to the ribs or fixed to the roof sheeting. Check for rust, loose fixings, and worn sealant around screw penetrations. Older galvanised iron roofs that show corrosion may need repair or replacement first.
Asbestos Cement Sheeting
Homes built before the mid-1980s may have asbestos cement roofing. This requires special care. Drilling, fixing, or disturbing asbestos sheeting can release hazardous fibres. In Western Australia, work involving asbestos is regulated, and most solar installers will decline to install on asbestos roofs. In many cases, the safest approach is to have a licensed removalist replace the roof before installing solar. Do not attempt to drill into or clean suspected asbestos sheeting yourself. A licensed assessor can confirm the material.
Signs Your Roof May Need Attention Before Solar
- Cracked, slipped, or crumbling tiles that suggest age-related deterioration
- Rust, corrosion, or lifting on metal sheets and flashing
- Sagging roof lines or visible movement in the roof frame
- Water stains on ceilings or known leaks after rain
- Deteriorated pointing on ridge capping, which can loosen over time
- Damaged or rotting timber battens and rafters found during inspection
If you notice any of these, arrange a roof inspection from a qualified roofer before getting solar quotes.
Structural Load: Can an Old Roof Carry the Weight?
A typical residential solar array adds roughly 15 to 20 kilograms per square metre. Most roofs designed to Australian standards can handle this, but older homes may have undersized or deteriorated timber framing, particularly in properties that have had previous alterations. A solar installer or a structural assessor should check rafter spacing, timber condition, and any signs of sagging. Termite damage is also a concern in Perth, so have the roof frame checked if there is any history of activity.
Cost Considerations: Roof First or Solar First?
Replacing a roof and installing solar at the same time is usually more cost-efficient than doing them separately. Scaffolding is already up, the roof is clear, and the installer can mount rails directly to new battens. If your roof is likely to need replacement within the next 5 to 10 years, it is generally better to do both together.
If the roof has 15 or more years of life left and passes inspection, installing solar now makes sense. The savings on electricity bills begin immediately, and the payback period for most Perth systems is commonly in the range of three to five years, depending on system size, usage, and tariffs.
Rebates and Incentives in 2026
The federal Small-scale Renewable Energy Scheme (SRES) continues to provide upfront discounts through small-scale technology certificates, though the value steps down each year as the scheme moves toward its 2030 end date. This means installing sooner rather than later captures a larger discount. Cheaper Home Batteries support from the federal government has also made adding storage more accessible, which suits Perth households with strong afternoon and evening usage. Check current eligibility and rates with a Clean Energy Council accredited installer, as program details change.
Western Australia's feed-in tariff arrangements through Synergy and Western Power's network rules also affect export limits and what you earn from surplus power. Confirm current rules before choosing system size, particularly if you are planning for 2027 and beyond.
Electrical Readiness of Older Homes
Roof condition is only part of the picture. Many older Armadale homes have outdated switchboards, ceramic fuses, or limited capacity. An inverter connection often requires a compliant switchboard with RCD protection. Upgrading the switchboard adds to the project cost but is an important safety step. Ask your installer to inspect the switchboard and wiring as part of the quote.
Shading, Orientation, and Roof Layout
In Perth, north-facing roof planes produce the best yield, though west and east-facing panels can still perform well and suit households that use more electricity in mornings or late afternoons. Older homes in established Armadale streets often have mature trees that cast shade. Even partial shading can reduce output, so consider microinverters or power optimisers if shade is unavoidable. Complex roof shapes with multiple small sections may limit how many panels fit.
Practical Steps Before You Install
- Have the roof inspected by a licensed roofer to assess condition, remaining life, and any asbestos risk.
- Get the roof frame checked for structural soundness and termite damage.
- Review your switchboard and wiring with a licensed electrician.
- Obtain quotes from at least three Clean Energy Council accredited installers.
- Ask about tile and sheet repairs and how breakage during installation is handled.
- Compare panel and inverter warranties, along with workmanship and roof penetration guarantees.
- Decide on system size based on your usage, export limits, and whether you want battery storage.
When It Makes Sense to Wait
Delay solar if your roof has widespread leaks, significant rust, damaged framing, or asbestos sheeting in poor condition. In these cases, the roof should be repaired or replaced first. The cost of coordinating both jobs is often lower than paying to remove and refit panels later, and it protects the long-term performance of your system.
Final Thoughts
For Armadale homeowners, an older roof does not automatically rule out solar. A sound tile or metal roof with at least 10 to 15 years of remaining life is usually a good candidate, while ageing, damaged, or asbestos roofs should be addressed first. A thorough inspection of the roof, framing, and switchboard, followed by quotes from accredited local installers, will help you decide with confidence and make the most of Perth's strong solar conditions.

Armadale Roof Restoration
WA, 6112
(08) 9560 7331
❧